
New marine aquarium "Swin-in" opened for 20th anniversary
Project: Expansion and renovation, 300 m3 seawater aquarium
Customer: ALPENTHERME Family Spa
Country: Salzburg - Austria
Products: Systems LSS
Year: 2024
New underwater world, with 300 m3 of seawater and around 500 sea creatures, fish and corals. Unique experience for guests to swim through a 9 metre tunnel surrounded by water and corals, face to face with colourful fish. The new swim-in aquarium is part of the renovation of the “Family World” area
Specifications:
Installation of Life Support Systems (LSS) for aquariums and aquaculture plants.
LIFE SUPPORT SYSTEMS (LSS) life support systems for AQUARIUMS and AQUACULTURE « A set of equipment and technologies designed to maintain a controlled, healthy and stable aquatic environment for fish and other aquatic organisms »
These systems include:
- Filtration (mechanical and biological): removes impurities, sediments and organic residues from the water.
- Disinfection: with ozone and UV to eliminate bacteria and parasites.
- Heating/cooling systems: to maintain optimal T.
- Control and regulation of chemical and physical parameters: ideal T, pH, redox, oxygen and salinity for different species.
- Aeration: provides oxygen to the water to ensure the respiration of aquatic organisms.
- Process: P 2-3 bar, T 40°C max, flow rates up to 1000 m3/h; High humidity and salinity environment.
- Pipes: UPVC / PE, PP/PE tanks.
Advantages:
- LSS references and relationship with Aliaxis
- Constant proximity to customer/project right from the initial stages
- Flexibility, timely action and... TEAM WORK
Downloads

302.3 KB, PDF get_app
PDF Sheet