EASY CLIP in the construction of the drainage network on the GRA – Tiber Crossing in Rome
Sorry, your browser does not support inline SVG.

For the rain water drainage, it’s use Easyclip  the universal mechanical saddle

Project: Third Lane of the Grande Raccordo Anulare (GRA) 
Customer: ANAS spa
Country: Rome, Italy
Products: Easy Clip, Special Connections
Year: 2007

 

Type of Intervention

Construction of the road surface drainage system as part of the expansion works for the third lane of the Grande Raccordo Anulare motorway in Rome.
The project included the construction of two steel bridges serving the two carriageways, with a total length of approximately 360 meters and a central free span of 160 meters.

Drainage System

Objective: Disposal of rainwater collected from the road shoulder.

Solution:
- Water collection points installed on the bridge surface
- Conveyance into a main collector running along the entire span
- Collector made of PVC pipes ranging from Ø200 mm to Ø630 mm

Role of Easy Clip

Function: Connection of vertical downpipes from the road surface to the main collector

Installation Method:
1. Construction of the main collector in situ
2. Drilling under each downpipe
3. Connection using Easy Clip

Advantages
  • Simplified installation process
  • Reduced construction time
  • Optimized overall project costs

 

Downloads

Our references
182.3 KB, PDF get_app